47,000
MAPP, LLC. was awarded the construction of the new Readiness Center at Camp Beauregard, a single-story training facility, Certified LEED Silver, divided into two training centers to be occupied by the onsite Military Police and Engineering Battalion Detachment. The facility contains training classrooms, a joint full-service cafeteria/kitchen designed to serve 800-1000 personnel per day, separate munitions (gun) vaults and equipment lockers for both the Miliary Police and Engineering Battalion Detachments. The Training Center was constructed on a pile supported foundation and designed with a steel structure with acoustical metal panels. The Readiness Center includes a 30 ft. by 150 ft. solar array yard which is designed to handle the electrical load of 70% of the interior LED lights for the building.